Adding length to BEGINNING of a VSP?

Moderator: Ken Berry

Post Reply
hmeader
Posts: 9
Joined: Mon Jun 06, 2016 10:15 pm
operating_system: Windows 10
System_Drive: C
32bit or 64bit: 64 Bit
motherboard: Dell laptop
processor: i7-6700HQ 2.6Ghz
ram: 16GB
Video Card: NVIDIA GEForce 960M
sound_card: RealTek HD Audio
Hard_Drive_Capacity: 1.2TB
Monitor/Display Make & Model: HP 2311x
Corel programs: VideoStudio Ultimate 2018,PShopProX8/19

Adding length to BEGINNING of a VSP?

Post by hmeader »

I have a complex project that I now want to add a title at the beginning of, and a bit of black img to put the title over. How does one add maybe 30 seconds of time to the beginning of a project without having to move EVERYTHING piecemeal?

Thanks
User avatar
lata
Site Admin
Posts: 14280
Joined: Thu Jan 19, 2012 6:21 am
operating_system: Windows 10
System_Drive: C
32bit or 64bit: 64 Bit
motherboard: ASUSTeK COMPUTER INC A88XM-A USB 3 1 Rev X 0x
processor: 4 10 gigahertz AMD A10-7890K Radeon R7
ram: 16 gb
Video Card: on board
sound_card: Realtek High Definition Audio
Hard_Drive_Capacity: 500 SSD
Monitor/Display Make & Model: LG W2242 [Monitor]
Corel programs: CVSX, 19, 20, 22 PSP2023, PI, MS3D
Location: UK
Contact:

Re: Adding length to BEGINNING of a VSP?

Post by lata »

Hi
Use Ripple Editing
To the left of the timelines you will see a link icon
Click top link to turn on ripple editing, turns blue
Select all other links on timelines that contains clips

Add a clip to the beginning of the top timeline
You can use any type of clip, there are colour clips in the graphics library that are useful

All clips should move right keeping in sync / relative position
New forum for PSP and VS users, register if you need help

https://psp-vs-forums.freeforums.net
hmeader
Posts: 9
Joined: Mon Jun 06, 2016 10:15 pm
operating_system: Windows 10
System_Drive: C
32bit or 64bit: 64 Bit
motherboard: Dell laptop
processor: i7-6700HQ 2.6Ghz
ram: 16GB
Video Card: NVIDIA GEForce 960M
sound_card: RealTek HD Audio
Hard_Drive_Capacity: 1.2TB
Monitor/Display Make & Model: HP 2311x
Corel programs: VideoStudio Ultimate 2018,PShopProX8/19

Re: Adding length to BEGINNING of a VSP?

Post by hmeader »

OH I see what you mean about the link. SO that moves that line of timeline down at the same rate as the others if I click them all?

I'm not really familiar with what Ripple Editing means, so I'll have to trust ya.
Post Reply