Replace clip with longer clip/ overlays out of sync

Moderator: Ken Berry

Post Reply
johnmorgan13
Posts: 1
Joined: Wed Mar 13, 2019 9:58 am
operating_system: Windows 8.1
System_Drive: C
Contact:

Replace clip with longer clip/ overlays out of sync

Post by johnmorgan13 »

Hi. In the middle of Track 1, I want to replace Clip A with Clip B, which is 7 seconds longer than Clip A.

Once I replace Clip A, the overlays are 7 seconds behind.

What is the best way to move all the overlays, from the new clip to the end of the video, over 7 seconds?

Thanks & Regards,
live net tv
BJC
Posts: 306
Joined: Thu Jan 24, 2013 9:21 am
operating_system: Windows 10
System_Drive: C
32bit or 64bit: 64 Bit
ram: 8GB
Hard_Drive_Capacity: 1TB
Corel programs: Videostudio X10 and 2020
Location: England

Re: Replace clip with longer clip/ overlays out of sync

Post by BJC »

Unfortunately you haven't told us what version of Videostudio you are using nor did you fill in the details on your profile please help us to help you , fill in your profile

in *most* versions of Videostudio you cure the problem by enabling 'Ripple Editing', but if you have VS2019 it doesn't work - the whole version is a dud you will have to move every thing manually - you can try the standard Windows multi-select options of 'select >> shift+select ' works in previous versions
Post Reply