Hi. In the middle of Track 1, I want to replace Clip A with Clip B, which is 7 seconds longer than Clip A.
Once I replace Clip A, the overlays are 7 seconds behind.
What is the best way to move all the overlays, from the new clip to the end of the video, over 7 seconds?
Thanks & Regards,
live net tv
Replace clip with longer clip/ overlays out of sync
Moderator: Ken Berry
-
johnmorgan13
- Posts: 1
- Joined: Wed Mar 13, 2019 9:58 am
- System_Drive: C
- Contact:
-
BJC
- Posts: 306
- Joined: Thu Jan 24, 2013 9:21 am
- System_Drive: C
- 32bit or 64bit: 64 Bit
- ram: 8GB
- Hard_Drive_Capacity: 1TB
- Corel programs: Videostudio X10 and 2020
- Location: England
Re: Replace clip with longer clip/ overlays out of sync
Unfortunately you haven't told us what version of Videostudio you are using nor did you fill in the details on your profile please help us to help you , fill in your profile
in *most* versions of Videostudio you cure the problem by enabling 'Ripple Editing', but if you have VS2019 it doesn't work - the whole version is a dud you will have to move every thing manually - you can try the standard Windows multi-select options of 'select >> shift+select ' works in previous versions
in *most* versions of Videostudio you cure the problem by enabling 'Ripple Editing', but if you have VS2019 it doesn't work - the whole version is a dud you will have to move every thing manually - you can try the standard Windows multi-select options of 'select >> shift+select ' works in previous versions
