Shift entire timeline to right in VS12?
Posted: Sat Jul 04, 2009 9:20 pm
Hello all,
I'm using Video Studio Pro X2 to create a wedding video. I made the entire video project, and it worked great. Now, however, they want me to add about 3 minutes of photos and music to the beginning.
My problem is that there's some very precisely set audio and video synchronization throughout the project, with audio on both the voice and music tracks. If I insert the pictures to the beginning, it will shift the video track that much to the right, but not the voice or music tracks.
Is there some way to lock the video, music, and voice tracks together to move them all at once?
Thanks in advance.
I'm using Video Studio Pro X2 to create a wedding video. I made the entire video project, and it worked great. Now, however, they want me to add about 3 minutes of photos and music to the beginning.
My problem is that there's some very precisely set audio and video synchronization throughout the project, with audio on both the voice and music tracks. If I insert the pictures to the beginning, it will shift the video track that much to the right, but not the voice or music tracks.
Is there some way to lock the video, music, and voice tracks together to move them all at once?
Thanks in advance.