Project duration not reducing upon deleting clips from timel
Posted: Sun Aug 24, 2008 8:31 am
Hi,
I am a new VS11+ user and spent a better part of the day trying to find an answer to this issue -- but no luck.
I am creating a standard DVD from video clips (AVHCD) captured on my Canon HG-10 camcorder. I created a project using the Movie Wizard, added several clips to the timeline and then saved the project. The Burn-module inidicated that I was over the 4.3 GB limit -- so I opened the project using the VS11 editor and deleted some clips from the timeline (these clips were at the end of the timeline). However, the project duration has not changed from its original duration (1h 24 m) -- the reduced duration after removing the clips should be 1h 08m -- after going back to the Create-disc menu, the size still greater than what the DVD format will support.
Is there a way to get the project duration reduced when clips are removed from the timeline?
Thanks very much!
mrcotton73
I am a new VS11+ user and spent a better part of the day trying to find an answer to this issue -- but no luck.
I am creating a standard DVD from video clips (AVHCD) captured on my Canon HG-10 camcorder. I created a project using the Movie Wizard, added several clips to the timeline and then saved the project. The Burn-module inidicated that I was over the 4.3 GB limit -- so I opened the project using the VS11 editor and deleted some clips from the timeline (these clips were at the end of the timeline). However, the project duration has not changed from its original duration (1h 24 m) -- the reduced duration after removing the clips should be 1h 08m -- after going back to the Create-disc menu, the size still greater than what the DVD format will support.
Is there a way to get the project duration reduced when clips are removed from the timeline?
Thanks very much!
mrcotton73