timeline

Post Reply
dabear
Posts: 140
Joined: Thu Jan 26, 2006 5:23 pm
Location: Canada

timeline

Post by dabear »

I was working on a project but I have to cut out like 3mins of video but keep the ending. So the ending starts at about 3mins on the time line but i want to move the project to the start of the timeline without having to move piece by piece. How do i do this?
Msp 8.0 baby yeaaahhhh
dabear
Posts: 140
Joined: Thu Jan 26, 2006 5:23 pm
Location: Canada

Post by dabear »

K i figured it out, I couldn't locate the "track Selection" to move everything.
Msp 8.0 baby yeaaahhhh
Post Reply