According to the manual, this should be simple. However, after clicking the "Capture" Tab, "Options" is greyed out. (Formerly, I was using a Convert-X to capture camcorder images. This is now disconnected. I'm using my external burner to read the DVD. The DVD plays fine in my Sony player.)
I'm obviously missing something (hopefully small.) Have tried several ideas to no avail.
Help, as usual, is very much appreciated!
Frank
Using a DVD+R as a Video Source in VS8
Moderator: Ken Berry
-
skier-hughes
- Microsoft MVP
- Posts: 2659
- Joined: Thu Jul 21, 2005 10:09 am
- System_Drive: C
- 32bit or 64bit: 64 Bit
- motherboard: gigabyte
- processor: Intel core 2 6420 2.13GHz
- ram: 4GB
- Video Card: NVidia GForce 8500GT
- sound_card: onboard
- Hard_Drive_Capacity: 36GB 2TB
- Location: UK
Thanks Graham. Sorry to be so really stupid as I had imported both audio and image files a couple of weeks back.
I wonder what the best way would be, though, to find a scene for final inclusion into the project if I wanted to avoid importing the entire DVD contents into the library. (I see it divided into 8 min segments.) My "brute force" approach would be to watch the DVD external to VS8, note the point in time at which the desired scene(s) start(s), then import only the desired segments. Or is there a more elegant way? (There usually is!)
Thanks again.
Frank
I wonder what the best way would be, though, to find a scene for final inclusion into the project if I wanted to avoid importing the entire DVD contents into the library. (I see it divided into 8 min segments.) My "brute force" approach would be to watch the DVD external to VS8, note the point in time at which the desired scene(s) start(s), then import only the desired segments. Or is there a more elegant way? (There usually is!)
Thanks again.
Frank
You might try downloading the trial version of VS10. It has in improved Import tool, that allows you to choose chapters to import.
In general, I would just go ahead and import the whole program. You are going to be editing it anyway. If you are just using one or more short clips, you can import the whole thing and save the clips individually. Then, you can delete the original "import", if you wish. (I usually keep everything on the hard drive 'till I start a new project... I delete all of the old stuff before starting something new.)
In general, I would just go ahead and import the whole program. You are going to be editing it anyway. If you are just using one or more short clips, you can import the whole thing and save the clips individually. Then, you can delete the original "import", if you wish. (I usually keep everything on the hard drive 'till I start a new project... I delete all of the old stuff before starting something new.)
[size=92][i]Head over heels,
No time to think.
It's like the whole world's
Out of... sync.[/i]
- Head Over Heels, The Go-Gos.[/size]
No time to think.
It's like the whole world's
Out of... sync.[/i]
- Head Over Heels, The Go-Gos.[/size]
I would recommend importing the entire DVD (Right click in the timeline, then "Insert DVD/DVD-VR) and either multi-edit or mark in/out the beginning and end down to the single portion that you need.
I've found that if I only import selected chapters and the section of video I need resides in 2 different chapters and I import both, there is a blip of a pause in my final project where the chapters used to be. If I import the entire thing and use the same section of video, there is no blip, or hesitation.
Say, for instance, that I have chapters every 5 minutes and the video I need runs from 4:00 to 6:00. If I import chapters 1 and 2, there will be a bit of hesitation one minute into that clip (the old chapter mark). Unless I'm missing a setting somewhere...
Thad
I've found that if I only import selected chapters and the section of video I need resides in 2 different chapters and I import both, there is a blip of a pause in my final project where the chapters used to be. If I import the entire thing and use the same section of video, there is no blip, or hesitation.
Say, for instance, that I have chapters every 5 minutes and the video I need runs from 4:00 to 6:00. If I import chapters 1 and 2, there will be a bit of hesitation one minute into that clip (the old chapter mark). Unless I'm missing a setting somewhere...
Thad
Using Video Studio Pro X2