I'm using Video Studio 10 plus, and my questions are:
1. Many times I have several dozen of clips in my project (who doesn't?). When I want to add transitions between clips (same transitions everywhere) I have to do this one after another. Is there any way to add transitions to the whole project in one go?
2. Sometimes I want to change duration of the transitions to shorter time than 1 sec. But in "Preferences" shortest time that can be set is 1 second. Again, is there any way to change time for many transitions automatically?
3. Does VS10 allow batch job other than batch convert? For example, when I want to compress using Xvid (2-pass method), first I set to "1st pass", then video is rendering, then after it's finished I have to switch to "2nd pass" and render video again. So I have to wait till "1st pass" is over to start "2nd pass". And I would like to set "1st pass" and "2nd pass" as a batch jobs first, and then those jobs and go for a walk or to the cinema for example
Thanks for any answers.
